The private atelier

Tell us what
you want to make

Whether you have a finished design or simply the beginning of an idea, our team will help shape the next step for your collection.

Bring a reference or begin with a conversation

A personal reply within 2 days
OEM / ODM · Ready styles from 3 pieces · Custom from 12 pieces

Your collection brief

From your project details to our reply

Describe your silver collection

Request a quote

Share your collection direction, buying requirements and reference materials.

Project details (optional)

Up to 3 files: JPG, PNG, WebP, or PDF. Maximum 5 MB each, 15 MB total.

We reply within 2 days.

925 sterling silver bracelet HLL-BYB03417

A personal approach

From reference
to inquiry

From your first reference to the final presentation, each collection begins with a conversation. Share your ideas directly with our team and receive a personal reply within 2 days.

Guangzhou Haolilai Silver Jewelry Co., Ltd.

Material & compliance testing

EU REACH (Pb/Cd/Ni) & RoHS tested

EU REACH Annex XVII tested: lead and cadmium content (Entries 63 & 23) and nickel release (Entry 27, EN 1811:2023) on rings, earrings and necklaces. All passed (STAR-TECH Shenzhen, 2026). 925‰ silver content and RoHS heavy-metal screening were also tested by third-party labs. Selected test documents are shown below.

Full reports are available to buyers on request. Results apply to the samples tested; order-specific testing can be arranged.

Redacted silver content test conclusion page for a sample ring, report 6100000253

Silver content · 925‰

Sample ring · 2025
Report 6100000253
Phone and signatures redacted

REACH Annex XVII test PASS summary: lead and cadmium content, nickel release for a sample ring, report STC20260922004-1

REACH · Ring

Pb / Cd content, Ni release
STAR-TECH · 2026
Approved public PASS summary

RoHS verification of conformity document for submitted jewelry samples, NAP25100792C01E

RoHS · Verification

Submitted jewelry samples
NAP Testing · 2025
Report NAP25100792C01E

Original document languages retained for evidence. Phone and handwritten signatures on the silver-content conclusion page are covered in the public copy.

From idea to collection

From idea to production

01 · Share your idea

A sketch, reference or product direction is enough to begin.

02 · Approve your sample

Sampling takes approximately 10 days.

03 · Create your collection

Bulk production is approximately 20–25 days.

Inquire ↗
Scroll to Top